Organizes toolbox talk before infrastructure subcontractors start work. Planning of all works including backfill work related to excavation works and defined plan (construction method, etc.) maintains proper. Checking and confirming whether there are overhead lines and underground facilities in the area controls the interactions with neighboring structures. Allows daily inspection of the excavation site. The excavation site is located on the project. As far as possible, the work is carried out during daytime working hours, and if it is necessary to do so at night, it provides lighting opportunities in the area. Ensures that the relevant work permit requirements are met by checking, gives the necessary approvals. It provides safe access / exit to the excavation work area. It follows the supply and placement of hard barriers in the area to be excavated. Allows material stock sites to be far from overhead lines. After situations that affect the stability of the excavation, such as rainfall, decisions are made to continue the excavation work and ensure that the excavation work is carried out in accordance with this procedure. It monitors the work of responsible engineers / technicians in the field for infrastructure work. Allows you to determine the service paths in the excavation area. It organizes the employees of the excavation area to receive emergency training related to the excavation. It monitors that the work under its responsibility is carried out in accordance with occupational health and safety / environmental rules. It ensures that employees such as operators and flaggers working in the field of work do not work without training. It manages not to allow operation of work equipment whose work is not completed, such as maintenance and periodic inspection. |